BP113057 - 2350 Delinea
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP113057 - 2350 Delinea | |
---|---|
Neighbourhood: | Diver Lake |
Street Address: | 2350 Delinea |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP113057 |
Date Application Submitted: | June 25, 2008 |
Application Description: |
WPC Building Services - shell building Building Classification: Part 3, 3.2.2.72, 2 storey's, combustible, sprinklered, fire alarm, Group F-2 with subsidiary Group D occupancy, 45 min. FRR/FS for floors assembly and loadbearing supports. Building area by code = 934 m2 1st storey (3 exits) and 172m2 2nd storey (separate suite) 1 exit required with 45min FRR/FS. 1 storey F2 warehouse (pre-engineered steel) 757m2 with admin/showroom on 1st storey 177m2 (wood frame) and office 2nd storey 172m2 (wood frame) Group D separate suite. Foundation under BP113058. Future permit required to complete and occupy. Alternative Solution (water curtain) by GHL Consultants Ltd. for exposed building face, North (1hr FRR) non-combustible wall and cladding, West and South (2hr FRR) non-combustible wall and cladding. |
Application Status: | COMPLETED |
Permit Value: | $480,000.00 |
Builder: | KTYM HOLDINGS LTD |
Issued Date: | February 16, 2009 |
File Close Date: | January 13, 2014 |
Associated Properties
Address | Zone | More |
---|---|---|
2350 DELINEA PLACE | I3 | Property Report |
Process Steps
Task | Status |
---|---|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
OCCUPANCY-OLD |
PASSED
2014-01-13 |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2014-01-13 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.