BP113608 - 104 6596 Applecross
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP113608 - 104 6596 Applecross | |
---|---|
Neighbourhood: | Dover |
Street Address: | 104 6596 Applecross |
Type of Application: | Leasehold Improvements |
File Number: | BP113608 |
Date Application Submitted: | December 17, 2008 |
Application Description: |
Unit 104 - Man-Lee Oriental - Tenant improvements only for Unit 104, This permit is for a Group E, 2538 sq.ft. (235.78 m2), two exits required. Sprinkler modifications. Installing a universal washroom in compliance with 3.8. Ensure fire stopping, fire dampers at any penetration of rated fire separations. The 45 min FRR/FS roof-ceiling assembly and the 45 min. FRR/FS demising walls and 1 hr. FRR on the exterior wall are installed under the base building BP112591. Description of base building under BP112591 Building C: - 6596 Applecross - 1493.46 m2 - Group E/Group A2 - Classification 3.2.2.62/3.2.2.27, Sprinklered, Fire Alarm, combustible, N & E exterior walls 1 hr. FRR and 45 min. FRR/FS demising walls, 45 min. FRR/ FS Roof-ceiling assembly. Physical File Scanned + attached Jun 12, 2009 db |
Application Status: | COMPLETED |
Permit Value: | $50,000.00 |
Building Area: |
235.78 M2 2,537.91 ft2 |
Builder: | GEORGIA VIEW DEVELOPMENT CORP |
Issued Date: | January 27, 2009 |
File Close Date: | June 02, 2009 |
Associated Properties
Address | Zone | More |
---|---|---|
6596 APPLECROSS ROAD | CC4 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2009-06-02 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.