BP117277 - 5180 Dublin (Bldg B) - 5220 Metral (parent) -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP117277 - 5180 Dublin (Bldg B) - 5220 Metral (parent) -- Scanned | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 5180 Dublin (Bldg B) - 5220 Metral (parent) -- Scanned |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP117277 |
Date Application Submitted: | April 20, 2012 |
Application Description: |
INSPECTIONS UNDER BP117277 FOR Building B - 5180 Dublin Way - 572.4 m2 101, 102, 103 lower floor area = 284.4 m2 201, 202, 203 upper floor = upper floor area = 288 m2 Part 9 - 2 storeys – sprinklered/fire alarm - Providing 1 hour FRR/FS, Providing - 1 hr FRR/FS - for future considerations occupancies. Providing 1 hr FRR for exterior walls for North , East and west Wall. 45 min required. Future permit required for each Unit. Xreference bp 117437 for the foundation permit . Building B - 5180 Dublin Way.- Foundation inspections BP117444 |
Application Status: | COMPLETED |
Issued Date: | July 31, 2012 |
File Close Date: | May 30, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
101 5180 DUBLIN WAY | CD5 | Property Report |
102 5180 DUBLIN WAY | CD5 | Property Report |
103 5180 DUBLIN WAY | CD5 | Property Report |
203 5180 DUBLIN WAY | CD5 | Property Report |
202 5180 DUBLIN WAY | CD5 | Property Report |
201 5180 DUBLIN WAY | CD5 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2013-05-30 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.