BP117332 - 2379A Troy Anne Way (formerly 2520 A Theresa Terrace) - Carriage House -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP117332 - 2379A Troy Anne Way (formerly 2520 A Theresa Terrace) - Carriage House -- Scanned | |
---|---|
Neighbourhood: | Diver Lake |
Street Address: | 2379A Troy Anne Way (formerly 2520 A Theresa Terrace) - Carriage House -- Scanned |
Type of Application: | Accessory Building |
File Number: | BP117332 |
Date Application Submitted: | May 07, 2012 |
Application Description: | For construction of slab on grade Carriage House. |
Application Status: | COMPLETED |
Permit Value: | $94,782.46 |
Building Area: |
69.90 M2 752.40 ft2 |
Builder: | DUECK GENERAL CONTRACTING |
Issued Date: | May 28, 2012 |
File Close Date: | October 12, 2012 |
Expiry Date: | May 28, 2014 |
Associated Properties
Address | Zone | More |
---|---|---|
2379 TROY ANNE WAY | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of Forms prior to any concrete being poured for footing inspection. Forms must be complete and approved plans (complete with City Stamp) must be onsite. |
CANCELLED |
FOOTING/FORMS
Inspection of Forms prior to any concrete being poured for footing inspection. Forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2012-10-12 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.