BP118463 - 2137 A Bowen Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP118463 - 2137 A Bowen Road | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 2137 A Bowen Road |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP118463 |
Date Application Submitted: | March 21, 2013 |
Application Description: |
Change of use of the residential dwelling unit on the 2nd storey to a business and personal service use, Group D occupancy. Also, includes the first storey center of building conversion from Group C to Group D. The conversion area of the 2nd storey, Group D = 98.245 m2, 1 st storey = 44 m2. The area of the conversion on the first storey includes a garage that will be separated with a 1.5 hour FRR/FS and a 1 Hour door with a FPR and self closing device. Tactile warning system to be installed at the top of all stairways. Meets 9.9.4.7 exemption for construction of exit stairs. adding handrails to inside stairs and outside stairs. 1 hour FRR with noncombustible cladding on the Exposed wall face on left and right of 2nd storey includes attic. Existing fire ratings between suites Part 9 buliding, Existing Group Eand Group D occupancies on the first story and second storey. Building area(Code) = 244.35m2, upper floor = 98.245 m2, Total floor area = 342.534m2 |
Application Status: | COMPLETED |
Permit Value: | $2,000.00 |
Issued Date: | June 10, 2013 |
File Close Date: | September 05, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
2137 BOWEN ROAD | COR3 | Property Report |
Process Steps
Task | Status |
---|---|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
SCHEDULED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2013-09-05 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.