BP119576 - 110 Wall Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP119576 - 110 Wall Street | |
---|---|
Neighbourhood: | Townsite |
Street Address: | 110 Wall Street |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP119576 |
Date Application Submitted: | March 25, 2014 |
Application Description: |
GROUP A2, unsprinklered field house for Caledonia Park. Add 23.41m2 (less than 25%) to existing change rooms/ washroom building. Construct two new shower areas c/w 5 new shower heads in each unit. relocate washrooms facilities in change rooms and add 2 new urnals. Relocate HW tank. Add 4 new 2' x4' skylights in change room area. Install rain screen and all new exterior cladding. July 21, 2014 - REVISION: Location of bathroom fixtures revised. |
Application Status: | COMPLETED |
Permit Value: | $140,000.00 |
Building Area: |
23.41 M2 251.98 ft2 |
Issued Date: | April 29, 2014 |
File Close Date: | August 06, 2014 |
Expiry Date: | April 29, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
110 WALL STREET | PRC3 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2014-08-06 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.