BP120194 - 6892 Island Hwy North (Tim Hortons) - DRAWINGS SCANNED
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP120194 - 6892 Island Hwy North (Tim Hortons) - DRAWINGS SCANNED | |
---|---|
Neighbourhood: | Dover |
Street Address: | 6892 Island Hwy North (Tim Hortons) - DRAWINGS SCANNED |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP120194 |
Date Application Submitted: | September 24, 2014 |
Application Description: |
Interior renovation of existing Tim Hortons. One storey, Group A2, 3.2.2.28, sprinklered, accessible, existing washrooms and office door. May 11,2015 - REVISION: Remove all brick exterior cladding and replace with Hardi plank siding and rainscreen. |
Application Status: | COMPLETED |
Permit Value: | $292,642.88 |
Builder: | DB CONTRCTING LTD |
Issued Date: | October 16, 2014 |
File Close Date: | June 15, 2015 |
Expiry Date: | October 16, 2016 |
Associated Properties
Address | Zone | More |
---|---|---|
6900 ISLAND HIGHWAY N | CC4 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2015-06-15 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.