BP120766 - 3251 Shenton Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP120766 - 3251 Shenton Road | |
---|---|
Neighbourhood: | Diver Lake |
Street Address: | 3251 Shenton Road |
Type of Application: | Leasehold Improvements |
File Number: | BP120766 |
Date Application Submitted: | April 14, 2015 |
Application Description: |
Tenant improvements to existing business (Triple T Party Rentals). Construct new 45 min F/S FRR 2nd floor exit stairwell, delete one washroom group on lower floor,add one bathroom group to 2nd floor level, change layout to mezzanine and lower floor areas and install new exit door on lower floor. Relocate 5 bathroom fixtures. New pad footings and post to support 2nd floor framing. Existing Part 3 Building,2 storey, Group F2, building area 598 m2 , unsprinklered, no fire alarm, existing 45min fire separation for the floor. Reclassified 1998 BCBC, 3.2.2.71 (2102 BCBC classification 3.2.2.76) |
Application Status: | COMPLETED |
Permit Value: | $172,000.00 |
Builder: | R W (BOB) WALL CONTRACTING LTD |
Issued Date: | June 03, 2015 |
File Close Date: | September 11, 2015 |
Expiry Date: | June 02, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
3251 SHENTON ROAD | I2 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2015-09-11 |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2015-09-15 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.