BP121114 - 1200 Dufferin Crescent (Equipment depot)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121114 - 1200 Dufferin Crescent (Equipment depot) | |
---|---|
Neighbourhood: | Townsite |
Street Address: | 1200 Dufferin Crescent (Equipment depot) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP121114 |
Date Application Submitted: | July 29, 2015 |
Application Description: |
Equipment Depot - interior renovation of existing storage space in basement under existing emergency wing. Adding 0hr Fire separation around the new Equipment depot room (360m2). New porter, supervisor, decontam and receiving rooms. Existing building (code)area (footprint) = 22023m2 (from Architect drawings), existing hospital = 7 storey highrise, 3.2.6 applies, sprinklered, fire alarm. Building Classification : 3.2.2.38 - Major occupancy -B2 - with subsidiary occupancies. |
Application Status: | COMPLETED |
Permit Value: | $600,000.00 |
Building Area: |
509.00 M2 5,478.83 ft2 |
Issued Date: | September 22, 2015 |
File Close Date: | April 27, 2016 |
Expiry Date: | September 22, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
1200 DUFFERIN CRESCENT | CS1 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2016-04-27 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.