BP121333 - 700 A Hamilton Avenue
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121333 - 700 A Hamilton Avenue | |
---|---|
Neighbourhood: | Harewood |
Street Address: | 700 A Hamilton Avenue |
Type of Application: | Accessory Building |
File Number: | BP121333 |
Date Application Submitted: | October 06, 2015 |
Application Description: | Detached secondary suite in accessory building located at rear of lot with lane access. Existing accessory building to be relocated. |
Application Status: | COMPLETED |
Permit Value: | $111,922.73 |
Building Area: |
70.70 M2 761.01 ft2 |
Issued Date: | November 18, 2015 |
File Close Date: | August 29, 2016 |
Expiry Date: | November 17, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
700 HAMILTON AVENUE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
FOOTING/FORMS
Inspection of Forms prior to any concrete being poured for footing inspection. Forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of Forms prior to any concrete being poured for footing inspection. Forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection. |
PARTIAL |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection. |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
FAILED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
FAILED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
SCHEDULED |
INTERIOR BRACED WALL PANELS | FAILED |
INTERIOR BRACED WALL PANELS | PASSED |
OCCUPANCY-OLD
Occupancy inspection to be used for new accessory suite (Carriage House). Covenant must be registered on title, HPO in place, private outdoor space must be provided for occupants, one onsite parking spot |
FAILED |
OCCUPANCY-OLD
Occupancy inspection to be used for new accessory suite (Carriage House). Covenant must be registered on title, HPO in place, private outdoor space must be provided for occupants, one onsite parking spot |
PASSED
2016-08-29 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.