BP121350 - 1105 Cedar Road(Maintenance Bldg)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121350 - 1105 Cedar Road(Maintenance Bldg) | |
---|---|
Neighbourhood: | Chase River |
Street Address: | 1105 Cedar Road(Maintenance Bldg) |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP121350 |
Date Application Submitted: | October 09, 2015 |
Application Description: |
Nanaimo Regional Landfill: Building description : Maintenance building , Part 9, Group F, Division 2, sprinklered., fire alarm, Building area: 401 m2 plus 148 m2 mezzanine. and 2nd storey. One exterior exit from mezzanine and 2nd floor. Conveniance stairs meet 3.2.8.(6)(3.2.2.77) for size. 2 hour FRR/FS wall assembly between the repair garage and the remainder of the floor space. 2 hour FRR/FS mezzanine floor / floor assembly. REVISION JUNE 20, 2016 - Changes to FRR assemblies, tactile warning strips, deletion of a window, FRR door all as noted on drawings. |
Application Status: | COMPLETED |
Permit Value: | $959,000.00 |
Builder: | ISLAND WEST COAST DEVELOPMENTS |
Issued Date: | March 14, 2016 |
File Close Date: | October 09, 2019 |
Expiry Date: | March 14, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
1105 CEDAR ROAD | CS2 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2019-10-09 |
FINAL-OLD
Final approval as per requirements on plans. |
SCHEDULED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.