BP121407 - 5470 Westdale Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121407 - 5470 Westdale Road | |
---|---|
Neighbourhood: | North Slope |
Street Address: | 5470 Westdale Road |
Type of Application: | Single / Two Family Alteration |
File Number: | BP121407 |
Date Application Submitted: | November 03, 2015 |
Application Description: |
Renovate second floor, build addition above garage, add ensuite bathroom. REVISION Feb. 17, 2016; Upper Floor - Bay window reduced & adjacent BWP lengthened, BWP removed, 3'x4' window added, lengthened BWP. Lower Floor - relocate OH garage door to accommodate 24" BWP, remove BWP between O/H doors, add BWP on left side of O/H door. REVISION May 13, 2016; Revised: Bathroom Layout, M Bed Entry, Bdrm #2 closet, 2'6" x 1"6" window installed in walkin closet and 3' x 4' window deleted on right side elevation in master bedroom. Baywindow openings to meet egress requirements. REVISION August 9 2014- changed tub to shower on plans as per field review. |
Application Status: | COMPLETED |
Permit Value: | $29,928.41 |
Building Area: |
58.93 M2 634.32 ft2 |
Issued Date: | November 27, 2015 |
File Close Date: | May 30, 2017 |
Expiry Date: | November 27, 2017 |
Associated Properties
Address | Zone | More |
---|---|---|
5470 WESTDALE ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
FAILED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
INTERIOR BRACED WALL PANELS
The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2017-05-30 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.