BP121421 - 2260 McGarrigle Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121421 - 2260 McGarrigle Road | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 2260 McGarrigle Road |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP121421 |
Date Application Submitted: | November 09, 2015 |
Application Description: |
Pacific Rim Distribution - Concrete block warehouse addition - 309.5 sm to existing building 534.5 sm . Total building area = 844 sm. Building description 3.2.2.77 sprinklered, with fire alarm. Existing office mezzanine. Adding new sprinklers throughout. Exposed buildng faces (Concrete Block) North and West 2 hr. FRR. South 45 min FRR. 1 existing washroom. Occupant load = 10 persons. REVISION: June 5, 2017 - Move sprinkler room and add overhead door. |
Application Status: | COMPLETED |
Permit Value: | $99,000.00 |
Builder: | Rodney Welbourn Contracting Ltd |
Issued Date: | April 18, 2016 |
File Close Date: | August 11, 2017 |
Expiry Date: | April 18, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
2260 MCGARRIGLE ROAD | I2 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
SCHEDULED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
APPROVAL-FIRE-OLD
Approval required prior to Occupancy |
COMPLETED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2017-08-11 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.