BP121521 - 3695 Lagoon Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121521 - 3695 Lagoon Road | |
---|---|
Neighbourhood: | Hammond Bay |
Street Address: | 3695 Lagoon Road |
Type of Application: | Single / Two Family Alteration |
File Number: | BP121521 |
Date Application Submitted: | December 17, 2015 |
Application Description: |
Expand front entry by closing in a portion of existing covered front deck, some interior renovations by removing/adding walls and new doors including an ensuite. REVISION Jan 12, 2016 - updated windows on rear of building. REVISION April 06, 2016 - added bedroom closet. |
Application Status: | COMPLETED |
Permit Value: | $120,000.00 |
Builder: | MIKE CHAN CABINETS |
Issued Date: | January 12, 2016 |
File Close Date: | August 08, 2016 |
Expiry Date: | January 12, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
3695 LAGOON ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
SCHEDULED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2016-08-08 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.