BP121631 - A - 5299 Rutherford Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121631 - A - 5299 Rutherford Road | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | A - 5299 Rutherford Road |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP121631 |
Date Application Submitted: | February 01, 2016 |
Application Description: |
Unit A (confirm on site) - - Group E- Part 9 building = [125.23 sm. (Unit A only)] No change from the previous use. 45 min. Fire resistance/Fire Separation between this unit and the adjacent unit to be confirm on site. One layer of 5/8" Type X Gypsum board on CRU side to 5/8" Type X Gypsum board ceiling also to be confirm on site. 45 min suite separation to temininate either at the 45 min FRR/FS ceiling or the underside of the roof ceiling. New Engineered Beam , Engineer sealed design may be required prior to framing approval. Concrete footing to be confirm on site for the beam support. Adding new Hot water tank & New Universal Washroom (ensure accessible requirements are met (requirements attached to the plans)New janitors room with required Fire separation. Ensure door has self closing device. Two exits required to meet travel distance. Add new exit door. Swing exit door out at front. April 14, 16 - Add W/D and move door location. |
Application Status: | COMPLETED |
Permit Value: | $15,000.00 |
Building Area: |
125.30 M2 1,348.72 ft2 |
Builder: | S & J CONSTRUCTION LTD |
Issued Date: | March 01, 2016 |
File Close Date: | April 19, 2016 |
Expiry Date: | March 01, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
5299 RUTHERFORD ROAD | CC1 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PARTIAL |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
FAILED |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
SCHEDULED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2016-04-19 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.