BP121831 - 4735 Rutherford Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121831 - 4735 Rutherford Road | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 4735 Rutherford Road |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP121831 |
Date Application Submitted: | April 04, 2016 |
Application Description: |
4750 Rutherford (Parent mall property) 4735 Rutherford (former Best Buy location), renovation includes dividing existing CRU into two CRU's to be created. Unit # 101- being an Group A2 Assembly occupancy (1431.6m2). Unit # 102 - being Group E Mercantile occupancy (863.06m2). Both CRU's will require future Tenant Improvements building permits. A 2hr FRR demissing wall to be provided between units, an existing 4hr firewall between this building and the mall to remain. Also a 1.5hr FRR between the Group E CRU and shipping/receiving bay. Health requirements for each CRU to be included under future tenant improvements building permits. Revision Sept 5, 2016 - Add and relocate sprinkler heads add dry pipe valve to sprinkler heads in front vestibule area. Building Classification 3.2.2.62, Group E, 2464 m2, Sprinklered with fire alarm. 4 hr firewall provided between this building and the mall. Considered separate building by alternative solution by Architect under BP111884. |
Application Status: | COMPLETED |
Permit Value: | $600,000.00 |
Building Area: |
2,264.00 M2 24,369.47 ft2 |
Issued Date: | May 26, 2016 |
File Close Date: | October 13, 2016 |
Expiry Date: | May 26, 2018 |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
SCHEDULED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2016-10-13 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.