Application Description: |
Extensive fire damage repairs to unit #434 of a multi-residential building. Work also includes structural repairs and installation of a sprinkler system by by-law. JULY 21, 17 - REVISION adding new copper lines due to theft of existing. |
Application Status: | COMPLETED |
Permit Value: | $170,000.00 |
Builder: | PROPACIFIC RESTORATION LTD/STEVEN CHATWIN |
Issued Date: | May 29, 2017 |
File Close Date: | January 29, 2018 |
Expiry Date: | May 29, 2019 |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
PARTIAL |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visiable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visiable for inspection. |
PASSED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
APPROVAL-ENGINEERING-OLD
Approval required prior to Final |
COMPLETED |
FINAL-OLD
Final Approval as per requested on plans. |
FAILED |
FINAL-OLD
Final Approval as per requested on plans. |
FAILED |
FINAL-OLD
Final Approval as per requested on plans. |
PASSED
2018-01-29 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.