Application Description: |
Tenant improvement, change of use from Group F2 to A2 occupancy (Airhouse gymnasium). Building classification 3.2.2.26 up to 2 storey, sprinklered, fire alarm system. Building area of 1209.31m2 with 1069m2 main floor and 139.9m2 mezzanine. 2hr FRR required between this A2 and adjacent F2 occupancy. Maximum 110 person occupant load including maximum of 60 persons on mezzanine. Building occupancies A-2 and F2, 1792m2 two storey, combustible or non-combustible construction, sprinklered with fire alarm system, 3/4 hr FRR for floors, mezz. & supports if of combustible construction. 2 hr FS between A-2 & F-2 |
Application Status: | COMPLETED |
Permit Value: | $30,000.00 |
Issued Date: | January 17, 2017 |
File Close Date: | March 06, 2017 |
Expiry Date: | January 17, 2019 |
Associated Properties
Address | Zone | More |
---|---|---|
4381 BOBAN DRIVE | I2 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING | PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
APPROVAL-FIRE-OLD
Approval required prior to Occupancy |
COMPLETED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2017-03-06 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.