BP123129 - 248 Cilaire Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123129 - 248 Cilaire Drive | |
---|---|
Neighbourhood: | Departure Bay |
Street Address: | 248 Cilaire Drive |
Type of Application: | Single / Two Family Alteration |
File Number: | BP123129 |
Date Application Submitted: | April 07, 2017 |
Application Description: | 9m2 kitchen addition onto existing deck. |
Application Status: | COMPLETED |
Permit Value: | $10,000.00 |
Building Area: |
9.00 M2 96.88 ft2 |
Issued Date: | May 05, 2017 |
File Close Date: | February 23, 2021 |
Expiry Date: | May 05, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
248 CILAIRE DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
COMPLETED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2021-02-23 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.