BP123584 - 109 - 335 Wesley Street (North Bldg.)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123584 - 109 - 335 Wesley Street (North Bldg.) | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 109 - 335 Wesley Street (North Bldg.) |
Type of Application: | Leasehold Improvements |
File Number: | BP123584 |
Date Application Submitted: | August 11, 2017 |
Application Description: |
Tenant improvement (Michael Warsh Law Corporation), approx area of 212.37,sprinklered. Work to include two washrooms one of which is an accessible washroom on lower level. Construction of a 1hr FS/FRR partition wall to create a separate CRU complete with accessible washroom as part of this permit. REVISION Sept 28th - Layout changes, delete bathroom in separate lease space, revise sprinkler layout. |
Application Status: | COMPLETED |
Permit Value: | $150,000.00 |
Builder: | TECTONICA MANAGEMENT INC |
Issued Date: | September 15, 2017 |
File Close Date: | November 15, 2017 |
Expiry Date: | September 16, 2019 |
Associated Properties
Address | Zone | More |
---|---|---|
335 WESLEY STREET | DT2 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2017-11-15 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.