BP123760 - 335 Terminal Avenue
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123760 - 335 Terminal Avenue | |
---|---|
Neighbourhood: | Newcastle/Brechin |
Street Address: | 335 Terminal Avenue |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP123760 |
Date Application Submitted: | October 11, 2017 |
Application Description: |
(Royal Motel) Construction of a 4' x 8' electrical room on the front of the building. 1 hr. F.R.R required between Electrical room and suite #108. 45 min. F.R.R. required between Laundry room and suite#108. Addition of 13 HWT's, one to each Motel room. Install 3 pcs bathroom to unit #108 and create new Laundry room with washing machine facility. Floor framing to be made new in units 107/108. Exterior stair have been replaced and require pad footings. REVISION: Sept 24/18 - Add HWT to Laundry room and add Window to Unit #108 |
Application Status: | COMPLETED |
Permit Value: | $20,000.00 |
Building Area: |
3.00 M2 32.29 ft2 |
Builder: | ROYAL HOTEL INC |
Issued Date: | June 27, 2018 |
File Close Date: | April 05, 2024 |
Expiry Date: | June 27, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
335 TERMINAL AVENUE N | COR2 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2024-04-05 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.