BP124030 - 161 Salish Way
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124030 - 161 Salish Way | |
---|---|
Neighbourhood: | Departure Bay |
Street Address: | 161 Salish Way |
Type of Application: | Single / Two Family Alteration |
File Number: | BP124030 |
Date Application Submitted: | January 16, 2018 |
Application Description: |
Add bump-out to dining room, remove partition wall to kitchen, add two new man doors and window, omit patio slider door REVISION: add front porch 17.03.2018 Apr 4/18: Revision - add windows to rear bump out REVISION: bedroom 1 ensuite 11.04.2018 |
Application Status: | COMPLETED |
Permit Value: | $15,000.00 |
Building Area: |
0.91 M2 9.80 ft2 |
Builder: | EYE FOR DETAIL CONSTRUCTION LTD |
Issued Date: | February 22, 2018 |
File Close Date: | August 31, 2021 |
Expiry Date: | February 22, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
161 SALISH WAY | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2021-08-31 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.