BP124258 - Unit "O" - 11 Cliff Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124258 - Unit "O" - 11 Cliff Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | Unit "O" - 11 Cliff Street |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP124258 |
Date Application Submitted: | March 23, 2018 |
Application Description: |
Building alteration for entire building, Unit O for (Tofino Bus Services Inc.), F-2 occupancy in165m2 building, on a property with multiple buildings. Scope of work includes changing from 2 single tenant units O & N to a single unit, rot repairs, window & door replacement, new interior wall finish, new hot water tank, installing new plumbing fixtures in both washrooms. Existing interior partition wall with openings between former units O & N will be finished with 1/2" type X drywall to accommodate future division into separate suites. Washroom at Terminal St. side of building to be the required "accessible" washroom. Building Classification: 165m2 Part 9 combustible, unsprinklered, building with F-2 occupancy REVISED Sept. 12, 2018 changes to non-structural wall. |
Application Status: | COMPLETED |
Permit Value: | $28,500.00 |
Issued Date: | July 10, 2018 |
File Close Date: | December 13, 2018 |
Expiry Date: | July 10, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
11 CLIFF STREET | DT4 | Property Report |
Process Steps
Task | Status |
---|---|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2018-12-13 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.