BP124284 - 525 Third Street (Phase 2) BLDG C
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124284 - 525 Third Street (Phase 2) BLDG C | |
---|---|
Neighbourhood: | University District |
Street Address: | 525 Third Street (Phase 2) BLDG C |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP124284 |
Date Application Submitted: | March 29, 2018 |
Application Description: |
Construction of a 22 strata unit residential apartment building with 5 commercial rental units on main floor and basement level. 794 m2, 4 storey, Group C 3.2.2.50, Group E 3.2.2.65 & Parking Garage Group F2 3.2.2.82. Total area of all floors, including parking garage is 3634.4 m2. Sprinklered, Fire Alarm system, combustible and/or noncombustible construction. 1 hr. FS/F.R.R. is required between suites, suites and corridors/stairwells/elevator shaft and 1 hr. F.R.R. for floor assemblies, load-bearing walls and columns. Parking Garage is required to be separated from the remainder of the building by a 1.5 hrs. FS/F.R.R. Commercial Units - #100-104 Residential Units - #201-211 & 301-311 REVISION: Sep 9/19 REVISION 2: Sep 10/20 |
Application Status: | COMPLETED |
Permit Value: | $4,000,000.00 |
Issued Date: | June 21, 2019 |
File Close Date: | September 10, 2020 |
Expiry Date: | June 21, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
103 525 THIRD STREET | COR2 | Property Report |
104 525 THIRD STREET | COR2 | Property Report |
100 525 THIRD STREET | COR2 | Property Report |
101 525 THIRD STREET | COR2 | Property Report |
102 525 THIRD STREET | COR2 | Property Report |
202 525 THIRD STREET | COR2 | Property Report |
203 525 THIRD STREET | COR2 | Property Report |
204 525 THIRD STREET | COR2 | Property Report |
205 525 THIRD STREET | COR2 | Property Report |
206 525 THIRD STREET | COR2 | Property Report |
207 525 THIRD STREET | COR2 | Property Report |
208 525 THIRD STREET | COR2 | Property Report |
209 525 THIRD STREET | COR2 | Property Report |
210 525 THIRD STREET | COR2 | Property Report |
301 525 THIRD STREET | COR2 | Property Report |
302 525 THIRD STREET | COR2 | Property Report |
303 525 THIRD STREET | COR2 | Property Report |
304 525 THIRD STREET | COR2 | Property Report |
305 525 THIRD STREET | COR2 | Property Report |
306 525 THIRD STREET | COR2 | Property Report |
307 525 THIRD STREET | COR2 | Property Report |
308 525 THIRD STREET | COR2 | Property Report |
309 525 THIRD STREET | COR2 | Property Report |
310 525 THIRD STREET | COR2 | Property Report |
211 525 THIRD STREET | COR2 | Property Report |
311 525 THIRD STREET | COR2 | Property Report |
525 THIRD STREET | COR2 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
CANCELLED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
CANCELLED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
APPROVAL-FIRE-OLD
Approval required prior to Occupancy |
IN-PROGRESS |
OCCUPANCY | CANCELLED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY | FAILED |
OCCUPANCY |
PASSED
2020-09-10 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.