BP124319 - 101 - 250 Prideaux Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124319 - 101 - 250 Prideaux Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 101 - 250 Prideaux Street |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP124319 |
Date Application Submitted: | April 11, 2018 |
Application Description: |
Alteration to create a new CRU - Unit 101 (Rhino Cafe) 118.3 m2 Group D (Low A2) Occupancy, create a new café (under 10% of the building) in an existing Group F2 occupancy building. Create a café with cooking/frying area with NFPA-96 hood fan, add 2 universal washrooms, DW, mop sink and 6 sinks. Max Occupancy 30 persons. Unit 102 (Romantic Ruins) – 1086.7 m2 Group F2 Occupancy with subsidiary retail space, Add an accessible washroom, add a sink and a new rear exit door. Building classification ((from previous permit) 3.2.2.71. F2, 1205 m2, unsprinklered, combustible and non-combustible construction. Production area shall not be used for retail or a separate CRU. Use of the basement is prohibited. REVISION: July 29/19 - Change non-loadbearing concrete foundation for fire separation to pressure treated wood foundation. REVISION 2: Dec.18/19 - Revise accessible washroom layout in unit 102. |
Application Status: | COMPLETED |
Permit Value: | $25,000.00 |
Issued Date: | March 13, 2019 |
File Close Date: | June 09, 2022 |
Expiry Date: | March 12, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
250 PRIDEAUX STREET | DT8 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
CANCELLED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
SCHEDULED |
APPROVAL-FIRE-OLD
Approval required prior to Occupancy |
COMPLETED |
APPROVAL-VIHA
Approval required prior to Occupancy |
APPROVED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2022-06-09 |
FINAL-OLD
Final approval as per requirements on plans. |
SCHEDULED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.