BP125121 - 209-335 Wesley Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125121 - 209-335 Wesley Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 209-335 Wesley Street |
Type of Application: | Leasehold Improvements |
File Number: | BP125121 |
Date Application Submitted: | December 20, 2018 |
Application Description: |
Renovation to provide live/work within existing office, adding shower, kitchen sink, w/d. June 12, 2020: Revision - remove heat detector from laundry area Existing Office/Retail/Assembly/Parking Building 1,037m2, divided into a storage garage, 665m2 (separate bldg), Part 9 bldg, 439m2, E/D occ. and a Part 3 bldg, E/D/A-2, 545m2 building, 2006BCBC A-2, 3.2.2.27 by a firewall, Building Code Report by GHL March 2008. sprinklered, combustible construction, 2 storey with mezzanines on non-combustible storage garage, 45min. rated floor assembly between 1st & 2nd floor, 45min FRR for supporting structure. |
Application Status: | COMPLETED |
Permit Value: | $15,000.00 |
Builder: | TECTONICA MANAGEMENT INC |
Issued Date: | June 24, 2019 |
File Close Date: | September 23, 2020 |
Expiry Date: | June 23, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
335 WESLEY STREET | DT2 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
SCHEDULED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
FAILED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
SCHEDULED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL
Final Approval as per requirements on plans. |
FAILED |
FINAL
Final Approval as per requirements on plans. |
PASSED
2020-09-23 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.