BP125233 - 2 - 1551 Estevan Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125233 - 2 - 1551 Estevan Road | |
---|---|
Neighbourhood: | Newcastle/Brechin |
Street Address: | 2 - 1551 Estevan Road |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP125233 |
Date Application Submitted: | February 19, 2019 |
Application Description: |
(NAI Commercial Real Estate) Enclose 24.2m2 of exterior space to create lunch room. Addition of kitchen sink and dishwasher. Existing 2 storey, unsprinklered building, combustible construction, Building classification 3.2.2.58, facing 2 streets. 45 min FRR/FS floor assemblies and 45 min FRR for roof assemblies code building area = approximately 1648m2. REVISION: May 17/19 - Added urinal to washroom, upgraded cold water lines to 1", construction and FRR changed to the ceiling, wood beam changed to steel beam to remove mid span column and lobby door changed from double leaf to single leaf w/ sidelight. |
Application Status: | COMPLETED |
Permit Value: | $75,000.00 |
Builder: | TECTONICA MANAGEMENT INC |
Issued Date: | May 14, 2019 |
File Close Date: | August 16, 2019 |
Expiry Date: | May 13, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
1551 ESTEVAN ROAD | CC3 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD | CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2019-08-16 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.