BP125330 - 1 - 5140 Metral Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125330 - 1 - 5140 Metral Drive | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 1 - 5140 Metral Drive |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP125330 |
Date Application Submitted: | March 13, 2019 |
Application Description: |
(RE/MAX Nanaimo) Tenant Improvement to Strata Unit 1 to create additional 327.7 m2 of office space on lower floor. Existing office space area is 841.8 m2. Future building permit required to occupy remaining 104.3m2 shell strata unit 2. One H/C accessible washroom. Building classification BCBC 2018 - 3.2.2.60 - Group D up to 3 storeys, unsprinklered. REVISION: Aug. 1/19-Increase Universal W/C size. Change corridor to suit. Interior office layout changes. Remove rough in in shell space. REVISION: Sep.12/19: Add 73.3sq m of office to make the total size of the unit 335m2. REVISION: Sep.27/19: Change layout reduce size of unit to 327.7m2 |
Application Status: | COMPLETED |
Permit Value: | $434,700.00 |
Issued Date: | June 06, 2019 |
File Close Date: | February 05, 2021 |
Expiry Date: | June 07, 2021 |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2021-02-05 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.