BP125386 - 850 Third Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125386 - 850 Third Street | |
---|---|
Neighbourhood: | University District |
Street Address: | 850 Third Street |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP125386 |
Date Application Submitted: | April 01, 2019 |
Application Description: |
(Serauxmen Sports Field) Batting cage - Construction of 210.95m2 - A3 occupancy, single storey bldg, non conditioned. Washrooms provided in Rotary Field House. July 2, 2020 - Revision: Add CRP, Electrical and Geotechnical Schedules. |
Application Status: | COMPLETED |
Permit Value: | $20,000.00 |
Builder: | CITY OF NANAIMO |
Issued Date: | May 06, 2019 |
File Close Date: | July 03, 2020 |
Expiry Date: | May 05, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
850 THIRD STREET | PRC1 , PRC3 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
OCCUPANCY | FAILED |
OCCUPANCY | FAILED |
OCCUPANCY |
PASSED
2020-07-03 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.