BP125407 - 2-5777 Turner Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125407 - 2-5777 Turner Road | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 2-5777 Turner Road |
Type of Application: | Leasehold Improvements |
File Number: | BP125407 |
Date Application Submitted: | April 05, 2019 |
Application Description: |
(TD Bank) Group D (office) interior tenant improvement, 2nd floor 340 m2 TD Canada Trust 790 m2 area total both floors. Work includes reconfiguration of interior partition walls, adding sink,dw Group "D" occupancy building, two storey sprinklered (by bylaw) combustible building . 340 m2 upper floor, Floor assembly fire separation and supporting structure 45min FRR . Stairwell (secondary) considered interconnected floor area as per 3.2.8.2.(6) BCBC no fire separation required. REVISION:2019-Oct,15- Add structural engineer. |
Application Status: | COMPLETED |
Permit Value: | $641,643.00 |
Issued Date: | July 04, 2019 |
File Close Date: | November 20, 2019 |
Expiry Date: | July 05, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
5801 TURNER ROAD | CC3 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2019-11-20 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.