BP125526 - 2089 Bluebell Terrace
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125526 - 2089 Bluebell Terrace | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 2089 Bluebell Terrace |
Type of Application: | Single / Two Family Alteration |
File Number: | BP125526 |
Date Application Submitted: | May 17, 2019 |
Application Description: |
For the construction of a secondary suite. Revision: Jun20- Alteration to suite layout. RM 2019-AUG-07 REVISION: move HWT. 2019-SEP-18 REVISION: add p eng. 2019-NOV-15 REVISION: change washroom to rough in only. |
Application Status: | COMPLETED |
Permit Value: | $50,000.00 |
Builder: | ISLAND RED CEDAR CONSTRUCTION LTD |
Issued Date: | June 20, 2019 |
File Close Date: | November 26, 2019 |
Expiry Date: | June 21, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
2089 BLUEBELL TERRACE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
CANCELLED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2019-11-26 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.