BP126105 - 58A - 6631 Island Highway N
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP126105 - 58A - 6631 Island Highway N | |
---|---|
Neighbourhood: | Dover |
Street Address: | 58A - 6631 Island Highway N |
Type of Application: | Leasehold Improvements |
File Number: | BP126105 |
Date Application Submitted: | January 23, 2020 |
Application Description: |
(Sunglass Hut) - Group E, 80.9 m2 - Work consists of removing store front grille door, installing accessible washroom, interior partition walls to create storeroom, new finishes, new storefront with doors and sprinkler changes. Woodgrove Center - Existing Group E building, 3.2.2.57, non-combustible construction, sprinklered with fire alarm system. REVISIONS: May 18 /21 - Change to the CRP and Architect and minor tenant design changes, sprinkler changes |
Application Status: | COMPLETED |
Permit Value: | $108,000.00 |
Issued Date: | December 23, 2020 |
File Close Date: | July 29, 2021 |
Expiry Date: | December 23, 2022 |
Associated Properties
Address | Zone | More |
---|---|---|
6631 ISLAND HIGHWAY N | CC4 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL
Final Approval as per requirements on plans. |
FAILED |
FINAL
Final Approval as per requirements on plans. |
FAILED |
FINAL
Final Approval as per requirements on plans. |
FAILED |
FINAL
Final Approval as per requirements on plans. |
PASSED
2021-07-29 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.