BP126358 - 901- 5800 Turner Rd
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP126358 - 901- 5800 Turner Rd | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 901- 5800 Turner Rd |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP126358 |
Date Application Submitted: | April 27, 2020 |
Application Description: |
(BC Assessment Office) Change of Use from Group A2 to D occupancy 944 m2, work includes change out and removing exterior doors, new partition walls, adding washrooms, shower, staff kitchen, changes to sprinklers and fire alarm system. Existing building constructed 1996, one storey, combustible construction, sprinklered with fire alarm. Sept 25/20 - Revision: increase size of waterline from mechanical room to allow for washroom autoflush fixtures |
Application Status: | COMPLETED |
Permit Value: | $600,000.00 |
Issued Date: | August 20, 2020 |
File Close Date: | December 21, 2020 |
Expiry Date: | August 22, 2022 |
Associated Properties
Address | Zone | More |
---|---|---|
5800 TURNER ROAD | CC3 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
APPROVAL-FIRE
Approval required prior to Occupancy |
APPROVED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2020-12-21 |
FINAL
Final approval as per requirements on plans. |
FAILED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.