BP126393 - 100-6540 Metral Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP126393 - 100-6540 Metral Drive | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 100-6540 Metral Drive |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP126393 |
Date Application Submitted: | July 02, 2020 |
Application Description: |
Completion of Tenant space (Regard Coffee Roasters) Unit #100 ,106.8 m2 change of occupancy from Group E to Group D ( low occupant load A-2) Existing 8072.8 m2 building classified as 3.2.2.50 Group C, up to 6 storey, combustible construction, sprinklered, fire alarm system over an 3.2.2.80. Group F3, Storage garage, non combustible construction. Lower level also includes a 106.8 m2, Group E occupancy CRU. 1.5hr FS/FRR required between residential and Storage garage(2 hr provided). 1 hr FS/FRR required for floor separation, 1hr FS/FRR required between residential units, Elevator shaft 1hr FS/FRR, exit stairs 1hr FS/FRR. Mar 26/21: Revision - change layout of millwork near washroom |
Application Status: | COMPLETED |
Permit Value: | $85,000.00 |
Builder: | WINDLEY CONTRACTING LTD |
Issued Date: | September 16, 2020 |
File Close Date: | March 29, 2021 |
Expiry Date: | September 16, 2022 |
Associated Properties
Address | Zone | More |
---|---|---|
100 6540 METRAL DRIVE | CC4 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
APPROVAL-VIHA
Approval required prior to Occupancy |
APPROVED |
OCCUPANCY |
PASSED
2021-03-31 |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2021-03-29 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.