BP126454 - 616 Victoria Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP126454 - 616 Victoria Road | |
---|---|
Neighbourhood: | South End |
Street Address: | 616 Victoria Road |
Type of Application: | Single / Two Family Alteration |
File Number: | BP126454 |
Date Application Submitted: | May 29, 2020 |
Application Description: |
Residential addition REVISION: 2020-SEPT-25- Add washer/dryer, window sizes, remove 3 pc. bath in basement |
Application Status: | COMPLETED |
Permit Value: | $15,000.00 |
Building Area: |
6.87 M2 73.95 ft2 |
Builder: | ISLAND RED CEDAR CONSTRUCTION LTD |
Issued Date: | July 15, 2020 |
File Close Date: | December 18, 2020 |
Expiry Date: | July 15, 2022 |
Associated Properties
Address | Zone | More |
---|---|---|
616 VICTORIA ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2020-12-18 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.