BP126601 - 2555 Bowen Road(Toyota)
Neighbourhood: Diver Lake    
Street Address: 2555 Bowen Road(Toyota)
Type of Application: Commercial / Multi-Res Alteration
File Number: BP126601
Date Application Submitted: October 15, 2020
Application Description: (Toyota) Remove and replace the North and East building elevation facades. Minor interior changes in board room. Raise and revise main entry parapet. Change fire service line connection inside building to provide back flow prevention and relocate and install water meter with radio readers.

Existing Group F-2 occupancy (1998 BCBC 3.2.2.72) 2221 m2 building main floor with 446.9m2 mezzanine. One storey, sprinklered, combustible with fire alarm system. 2 hour fire resistance rating at separation between repair/lube areas and showroom/office, no rating at roof or mezzanine.

REVISION: Dec 16, 2020 - Revision to add new fire domestic water meter service in building and P. Eng. on for Plumbing Systems.
REVISION 2: Mar 23, 2021 - Addition of a fluid storage building. REVISION 3: Aug 18/21 - Addition of vacuum equipment room.
Application Status: ACTIVE
Permit Value: $586,000.00
Builder: WINDLEY CONTRACTING LTD
Issued Date: December 07, 2020
Expiry Date: December 07, 2022

Associated Properties

Address Zone More
2555 BOWEN ROAD COR3 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
PLUMBING FINAL

All fixtures must be in place.

PASSED
APPROVAL-PLANNING

Approval required prior to Occupancy

APPROVED
FINAL

Final approval as per requirements on plans.

FAILED
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy