BP127048 - 401 - 1515 Dufferin Cres
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127048 - 401 - 1515 Dufferin Cres | |
---|---|
Neighbourhood: | Townsite |
Street Address: | 401 - 1515 Dufferin Cres |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP127048 |
Date Application Submitted: | December 21, 2020 |
Application Description: |
Complete and occupy, for Group D (Medical Office) 414 m2. adding plumbing fixtures,15 sinks,1 - 3 pc washroom, 3 - 2 pc washrooms, janitor sink, 1 DW, and 1 HWT. Sprinkler changes. Building reclassified under BP126872: (Colville Medical Center) Construction of 5 Storey, 3.2.2.24 (Group A), 3.2.2.62 (Group E), 3.2.2.56 (Group D) building with 5 Storey 3.2.2.80 (Group F3) parking garage. Building area 2020.5m2 Non-Combustible Construction, Sprinklered with Fire Alarm System. Building Code Description: First storey - Retail 3.2.2.62 (superimposed). 2nd -5th storey - Office 3.2.2.56. 2 Hr. FRR/FS required for floor assemblies/exits, between 1st and 2nd storey and loadbearing supports, 1 Hr. FRR/FS required for floor assemblies, exits and loadbearing support (above 2nd storey), 1.5 hr. FRR/FS required between Storage Garage and other occupancies. Exposed Bldg face requirements 2 hr. FRR West (Group E ),1 hr FRR South and East, 2 hr FRR for Garbage east wall face. |
Application Status: | COMPLETED |
Permit Value: | $334,350.00 |
Builder: | R.W. (BOB) WALL LTD. |
Issued Date: | January 19, 2021 |
File Close Date: | September 29, 2021 |
Expiry Date: | January 19, 2023 |
Associated Properties
Address | Zone | More |
---|---|---|
401 1515 DUFFERIN CRESCENT | CC5 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
FINAL
Final approval as per requirements on plans. |
PASSED
2021-09-29 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.