BP127841 - 200-2980 Island Highway N (Tim Horton's)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127841 - 200-2980 Island Highway N (Tim Horton's) | |
---|---|
Neighbourhood: | Departure Bay |
Street Address: | 200-2980 Island Highway N (Tim Horton's) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP127841 |
Date Application Submitted: | March 03, 2022 |
Application Description: |
Alteration/Addition (Tim Horton's) Existing Group A2 Occupancy. Convert 1/2 of existing right side elevation vestibule to Drive Thur c/w 4.9 m2 addition for serving window area to existing 238.4 m2 building. New sprinkler system, new fire alarm, interior layout changes relocate service area,kitchen and washrooms. Washrooms supplied 1 universal, 1 unisex and 1 staff. Plumbing changes included: delete 1 toilet & 1 urinal, add 4 sink and 1 auto washer. Building: 2018 BCBC 3.2.2.28. A2 Occupancy 243.3 m2 building, Combustible Construction, Sprinklered with Fire Alarm System REVISION Feb 10, 2023: Underslab plumbing revisions. REVISION Mar 01, 2023: Sprinkler revisions. REVISION Aug 09, 2024: DCW service connection changes from new fireline to domestic water line. |
Application Status: | ACTIVE |
Permit Value: | $500,000.00 |
Issued Date: | January 06, 2023 |
Expiry Date: | January 06, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
2980 ISLAND HIGHWAY N | CC3 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
FAILED |
FIRELINE
Fireline for the sprinkler system must be complete and visable for inspection. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PARTIAL |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
APPROVAL-ENGINEERING
Approval required prior to Occupancy |
IN-PROGRESS |
APPROVAL-FIRE
Approval required prior to Occupancy |
IN-PROGRESS |
APPROVAL-VIHA
Approval required prior to Occupancy |
APPROVED |
FINAL
Final approval as per requirements on plans. |
CANCELLED |
FINAL
Final approval as per requirements on plans. |
FAILED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.