BP127974 - 2214 McCullough Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP127974 - 2214 McCullough Road | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 2214 McCullough Road |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP127974 |
Date Application Submitted: | November 04, 2021 |
Application Description: |
(Island West Coast Developments) Construction of single story addition 52.03m2 of Group D offices to existing Part 3 Group D building and conversion of 23.73m2 of existing Group F2 (warehouse) to office space. Required 45min FS/FRR for exits. New Building Classification: BCBC2018 Group D (office/services) 3.2.2.63, 395.77m2 building area, 2 storey, sprinklered to NFPA13 with fire alarm, min 45min FS/FRR for floor assemblies and load bearing elements. Total GFA is 615.01m2 + 52.03m2 = 667.04m2. Existing Building Classification: BCBC 2012 Group D (office/services), Part 9, 343.74m2 building area, 2 storey, combustible construction, sprinklered with fire alarm. Interconnected floor space. 45 min FS/FRR for load bearing supports. Non-combustible floor assembly with allowed combustible heavy timber glulam beams. 2 washrooms on second floor. 1 universal washroom on ground floor. Total GFA is 615.01m2. REVISION: 2023-APR-19 - structural design changes to grade beams/RTU framing. |
Application Status: | ACTIVE |
Permit Value: | $166,384.27 |
Builder: | ISLAND WEST COAST DEVELOPMENTS |
Issued Date: | February 23, 2023 |
Expiry Date: | February 23, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
2214 MCCULLOUGH ROAD | I1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
CANCELLED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
SCHEDULED |
FINAL
Final approval as per requirements on plans. |
FAILED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.