BP128119 - 3270 Stephenson Point Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128119 - 3270 Stephenson Point Road | |
---|---|
Neighbourhood: | Linley Valley |
Street Address: | 3270 Stephenson Point Road |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP128119 |
Date Application Submitted: | December 17, 2021 |
Application Description: |
New single family dwelling 2023-AUG-31 REVISION: Add 2 piece powder room to basement level. |
Application Status: | ACTIVE |
Permit Value: | $900,000.00 |
Building Area: |
282.11 M2 3,036.60 ft2 |
Builder: | SOUTHFACE CONSTRUCTION |
Issued Date: | February 01, 2023 |
Expiry Date: | February 01, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
3270 STEPHENSON POINT ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PARTIAL |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PARTIAL |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.