BP128181 - 104-1220 Manzanita Place
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128181 - 104-1220 Manzanita Place | |
---|---|
Neighbourhood: | Linley Valley |
Street Address: | 104-1220 Manzanita Place |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP128181 |
Date Application Submitted: | January 18, 2022 |
Application Description: |
(Unit # 104) New 2-storey SFD with attached garage in multi-residential development, Building Classification: BCBC 2018 Group C (Residential), Part 9, combustible construction, Total GFA is 295.91m². REVISION 2024-APR-17: Change layout of kitchen, pantry, and laundry room, relocate door in upper floor bedroom, window added in upper floor bathroom , Changed deck to wood frame and vinyl decking,& changed Insulation values, add another bedroom to the upper floor with an increase of 33.47m² GFA, change layout and location of bathrooms and bedroom on upper floor. Total development is 5 units. BP128178 (Units 101) BP128179 (Units 102) BP128180 (Units 103) BP128185 (Units 105) |
Application Status: | ACTIVE |
Permit Value: | $840,000.00 |
Builder: | MOMENTUM DESIGN BUILD INC |
Issued Date: | March 18, 2024 |
Expiry Date: | March 18, 2026 |
Associated Properties
Address | Zone | More |
---|---|---|
104 1220 MANZANITA PLACE | Property Report | |
1220 MANZANITA PLACE | R6 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.