BP128440 - 4900 Island Highway (Building C)(Alais address 4920 Wills Road)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128440 - 4900 Island Highway (Building C)(Alais address 4920 Wills Road) | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 4900 Island Highway (Building C)(Alais address 4920 Wills Road) |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP128440 |
Date Application Submitted: | May 02, 2022 |
Application Description: |
Phase 1, Building C - Subaru Service Support and parking structure. New construction of 2018 BCBC 2 Storey, Part 3 Bldg, 3.2.2.79 (Group F2) repair garage and 3.2.2.86 (Group F3) parking garage. Building area 1625.29m2. Combustible or non-combustible construction, Sprinklered to NFPA13 with Fire Alarm System. 45min FRR/FS or 0hr FRR/FS non-combustible construction required for floor assemblies and supporting structures. Minimum 2hr FRR/FS between repair garage and all other occupancies. Minimum 1.5hr FRR/FS between storage garage and all other occupancies. Total GFA is 3208.34m2. Exposing Bldg face requirements; 1hr FRR for NE and SE (Repair garage F2), 45min FRR for SE (Car wash F3), and 1hr FRR for SW (E-Car Storage F3). |
Application Status: | ACTIVE |
Permit Value: | $6,513,000.00 |
Builder: | SUPERB CONSTRUCTION LTD |
Issued Date: | April 21, 2023 |
Expiry Date: | April 21, 2025 |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.