BP128453 - 4900 Island Highway (Building A - Subaru) (Alias address 4900 Wills Road)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128453 - 4900 Island Highway (Building A - Subaru) (Alias address 4900 Wills Road) | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 4900 Island Highway (Building A - Subaru) (Alias address 4900 Wills Road) |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP128453 |
Date Application Submitted: | May 07, 2022 |
Application Description: |
Phase 1, Building A - Subaru Service and Sales. New construction of 2018 BCBC 2 Storey, Part 3 Bldg. Major building classifications 3.2.2.79 (Group F2) repair garage and 3.2.2.86 (Group F3) salesroom/office. Building area 1395m2. Combustible or non-combustible construction, Sprinklered to NFPA13 with Fire Alarm System. Minimum 45min FRR/FS or 0hr FRR/FS non-combustible construction required for floor assemblies and supporting structures. Minimum 2hr FRR/FS between repair garage and all other occupancies. Minimum 45min FRR/FS for exits. Total GFA is 1802.11m2. Total mechanical mezzanines floor area is 39.44m2. Exposing Bldg face requirements; 1hr FRR with NC cladding for North and East exterior walls (repair garage F2 only). 2024-JUL-18 REVISION: Changes to canopy, canopy drain and underslab plumbing layout. 2024-JUL-25 REVISION: Changes to sprinkler layout, add sink and dw to lounge. |
Application Status: | ACTIVE |
Permit Value: | $6,241,440.00 |
Builder: | SUPERB CONSTRUCTION LTD |
Issued Date: | September 05, 2023 |
Expiry Date: | September 05, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
4900 ISLAND HIGHWAY N | COR3 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
FAILED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
FAILED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.