BP128534 - 102-540 Fifth Street (Meltwich)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128534 - 102-540 Fifth Street (Meltwich) | |
---|---|
Neighbourhood: | University District |
Street Address: | 102-540 Fifth Street (Meltwich) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP128534 |
Date Application Submitted: | June 08, 2022 |
Application Description: |
Commercial Alteration: Unit 102 (Meltwich) Group D, Low A2 119.8m2. Interior alteration to convert existing office space to a low occupant load A2 restaurant. New permitted scope of work includes new kitchen and dining area, 1 universal washroom, 1 unisex washroom, relocation of existing sprinkler heads, 1 new head for cooler, and installation of NFPA-96 cooking hood with chemical suppression system. Maximum occupant load of 20 people (based on washrooms). Single exit with maximum travel distance of 25m. 2hr FRR/FS between suites to be maintained. Existing Building Classification: BCBC2012 Group A2 (3.2.2.27) and Group D (3.2.2.61) occupancies, 432.9m2 building area, combustible or non combustible construction, sprinklered with fire alarm system. Existing 2hr FRR/FS between adjacent suites completed under BP111818. Building reclassified to BCBC2018 Group A2 (3.2.2.27) and Group D (3.2.2.63). |
Application Status: | ACTIVE |
Permit Value: | $80,000.00 |
Issued Date: | August 28, 2023 |
Expiry Date: | August 28, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
530 FIFTH STREET | CC3 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
CANCELLED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.