BP128707 - 105-238 Franklyn Street (RJC)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128707 - 105-238 Franklyn Street (RJC) | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 105-238 Franklyn Street (RJC) |
Type of Application: | Leasehold Improvements |
File Number: | BP128707 |
Date Application Submitted: | August 23, 2022 |
Application Description: |
Complete shell,Tenant improvement Group D (RJC Egineering), 202.4 m2. work includes constructing 48.2 m2 mezzanine, adding plumbing fixtures, partition walls, changes to sprinkler system Existing 5-storey, 46 unit mixed use building with 3 CRU shells.Building classification (superimposed occupancies) 3.2.2.24 Group A2, 3.2.2.50, Group C, up to 6 storeys,sprinklered. 3.2.2.56 Group D, up to 6 storeys, sprinklered. 3.2.2.62 Group E, Any height, any area, sprinklered. 3.2.2.80, Group F3, up to 6 storeys, sprinklered. Fire alarm system. Storage garage separated by 2hr FS/FRR from adjacent occupancies. Floors(E to C), elevator shafts and exit stairs at 1st and 2nd storey 2hr FS/FRR. Floors, elevator shafts and exit stairs floors 3-5 have 1hr FS/FRR. Separation between adjacent residential suites and corridors 1hr FS/FRR. Mezzanine floor 1hr FRR. Alternative solution includes combustible timber frame beams within a non-combustible construction area 2023-JAN-24 REVISION: HVAC changes |
Application Status: | COMPLETED |
Permit Value: | $200,000.00 |
Builder: | SAYWELL CONTRACTING LTD |
Issued Date: | September 15, 2022 |
File Close Date: | April 18, 2023 |
Expiry Date: | September 15, 2024 |
Associated Properties
Address | Zone | More |
---|---|---|
238 FRANKLYN STREET | DT2 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
CANCELLED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
OCCUPANCY
Booked is this tenant space has never had an occupancy or for a change in occupancy |
FAILED |
OCCUPANCY
Booked is this tenant space has never had an occupancy or for a change in occupancy |
PASSED
2023-04-18 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.