BP128776 - 355 Wakesiah Avenue (NDSS) Portable #126
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128776 - 355 Wakesiah Avenue (NDSS) Portable #126 | |
---|---|
Neighbourhood: | University District |
Street Address: | 355 Wakesiah Avenue (NDSS) Portable #126 |
Type of Application: | Locate Permit |
File Number: | BP128776 |
Date Application Submitted: | September 27, 2022 |
Application Description: |
Locate portable classroom # 126, BCBC 2018, 3.2.2.28 Group A-2 occupancy area of 89m² at NDSS. Work includes fire alarm tied to main school fire alarm panel, foundation design by structural engineer, one set of exit stairs and one exit ramp, emergency lighting and exit signage. Plumbing work includes installation of hand washing sink and HWT. 1 hr FRR exterior walls as per BCBC wall type EW1A Four portables clustered, considered one building BCBC 2018, 3.2.2.28 Group A-2 occupancy. Revised Alt Sol doc by GHL Oct. 2022 |
Application Status: | ACTIVE |
Permit Value: | $40,000.00 |
Building Area: |
89.00 M2 957.99 ft2 |
Issued Date: | October 04, 2023 |
Expiry Date: | October 04, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
355 WAKESIAH AVENUE | CS1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
FINAL
Final approval as per requirements on plans |
FAILED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.