BP128802 - 1270 Strathmore Street (Learning Studio #5 for SD 68)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128802 - 1270 Strathmore Street (Learning Studio #5 for SD 68) | |
---|---|
Neighbourhood: | Townsite |
Street Address: | 1270 Strathmore Street (Learning Studio #5 for SD 68) |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP128802 |
Date Application Submitted: | October 05, 2022 |
Application Description: |
(Learning Studio #5) Alteration: Renovation/repair of an 89.18m² portable learning studio, remove/replace one exterior door, add additional windows, all exterior walls to have a 1 hour FRR, remove interior partition walls and closet, add new interior partition walls for mechanical room, new exit signs and emergency lighting, covered porch conversion to interior space increasing the GFA by 2.91m², plumbing work includes; Installation of 1 sink & 1 HWT. ***Note: Future locate bldg permit required and is to include fire alarm verification as well as additional scope of work to determine site conditions, and occupancy classification. |
Application Status: | ACTIVE |
Permit Value: | $200,000.00 |
Issued Date: | June 16, 2023 |
Expiry Date: | June 16, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
1270 STRATHMORE STREET | CS1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.