BP128808 - 500 Duke Point Highway
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP128808 - 500 Duke Point Highway | |
---|---|
Neighbourhood: | Duke Point |
Street Address: | 500 Duke Point Highway |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP128808 |
Date Application Submitted: | October 17, 2022 |
Application Description: |
(Western Forest Products) Construction of a 81.2 m2 addition to the planer mill building for DPP MSR QC Grade-Testing Room. Combustible construction including sprinklers. Existing Building: Group F2 Industrial, combustible sprinklered. Building Area 4762.4 m2. REVISION 2023-AUG-01: Increase addition size from 44.4 m2 to 81.2 m2. |
Application Status: | ACTIVE |
Permit Value: | $100,000.00 |
Building Area: |
81.20 M2 874.03 ft2 |
Issued Date: | June 15, 2023 |
Expiry Date: | June 15, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
500 DUKE POINT HIGHWAY | I4 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms |
CANCELLED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.