BP129142 - 2595 Battersea Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129142 - 2595 Battersea Road | |
---|---|
Neighbourhood: | Departure Bay |
Street Address: | 2595 Battersea Road |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP129142 |
Date Application Submitted: | April 27, 2023 |
Application Description: |
New single-family dwelling on 5.5ft. crawl space, second on lot Second SFD development. Principal Dwelling (from 1940). Second Dwelling (BP129142) GFA is 241.46 m². DCC's charged at single family unit rate on Second Dwelling for a maximum of 170 m². 1 SFD credit applied to Principal Dwelling. |
Application Status: | ACTIVE |
Permit Value: | $500,000.00 |
Building Area: |
247.06 M2 2,659.33 ft2 |
Builder: | ARBUTUS INDUSTRIES LTD |
Issued Date: | July 17, 2023 |
Expiry Date: | July 17, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
2595 BATTERSEA ROAD | Property Report | |
2613 RANDLE ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
FAILED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PARTIAL |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.