BP129239 - 1548 Extension Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP129239 - 1548 Extension Road | |
---|---|
Neighbourhood: | Chase River |
Street Address: | 1548 Extension Road |
Type of Application: | Single / Two Family Alteration |
File Number: | BP129239 |
Date Application Submitted: | July 05, 2023 |
Application Description: |
Second-floor addition and renovations to basement and garage. Addition of a secondary suite. 2024-MAY-03 REVISION: Multiple changes. See approved plans. 2023-DEC-06 REVISION: Termination of structural engineer. Part 4 design changed to Part 9 design. Braced wall panels added. Add secondary suite in existing basement. |
Application Status: | ACTIVE |
Permit Value: | $200,000.00 |
Building Area: |
37.81 M2 406.98 ft2 |
Builder: | EYE FOR DETAIL CONSTRUCTION LTD |
Issued Date: | September 18, 2023 |
Expiry Date: | September 18, 2025 |
Associated Properties
Address | Zone | More |
---|---|---|
1548 EXTENSION ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.